1. There are 6 engineers of color mixing and modification materials, and the material modification is completed within 4 hours;
2. With 8 product and mold engineers, the new project can be connected to customers within two hours to optimize and design mold drawings;
3. With 10 business personnel, the cost analysis of the new project can be evaluated within an hour.
1.The sample testing can be completed within seven days.
2.Complete the order assessment and production scheduling within two days.
3.Complete the online production within 10 days
For customer feedback issues, we will provide a response and solution within 12 hours.
3Copyright © 2026 Jiangmen Xinchen Plastic Electronic Technology Co., Ltd. All rights reserved.